BEK Assembly Instructions


v  Return to BEK Main Page


Assembly Instructions for the BEK v1.x

 

  

 

The step-by-step instructions below will guide you to turn your mysterious pile of plumbing and fabricated parts into a biochar making machine which will allow you to visit all of the curious production variables that are important in the creation and application of biochar. After you have assembled the BEK (Biochar Experimenters Kit, v1.x), visit the BEK Operation Manual for run instructions.

 


Table of Contents:

I) Introduction

II) Tools 
     A) Tools Needed

     B) Sealing Materials

III) Assembly Instructions

1. Body

a) Insulation

b) Body

c) PyroBox

2. Chimney

3. Burner 

a) Burner Body

b) Burner Puff Lid

c) Propane Connection

4. Install Ignitors

a) Chimney

b) PyroBox

5. Gas Cap

6. Ejector and Gas Lines

a) Bio-Oil Condensing Circuit

b) Non-Condensing Circuit

7. Raw Biomass Auger and Level Switch

8. Hopper

9. Bio Char Auger and Reservoir

10. Instrumentation

 

I) Introduction

 

II) Tools 

A) Tools Needed

 

B) Sealing Materials Included 

 

  

 


 

III) Assembly Instructions

 

1. Body

A) Insulation 

 

    

 

B) Char Bucket

 

    

 

BEK 1.2 Note:

 

  

 

C) PyroBox

1. Attach PyroBox to Body 

 

   

 

2. Instal Valve Handles

 

 

  

 

2. Chimney

 

    

 

  

3. Burner

A. Burner Body

 

     

 

B. Burner Puff Lid

i) BEK v1.2

 

       

 

ii) BEK v1.3:

 

  

 

C. Propane Connection

 

 

 

4. Install Igniters

 

 

   

 

 

 

A. Chimney

 

 

      

 

B. PyroBox

 

 

5. Gas Cap

 

  

 

6. Ejector, Gas Lines and Description of Circuits

A) Bio-Oil Circuit: Running the BEK in condensing mode will allow the collection of pyrolysis oil. Collection of pyrolysis oil/ Bio-oil may be of interest for experimentation and utilization for various projects. When in condensing mode, any remaining constituents in the gas stream will still be introduced into the burner, ensuring a clean production of biochar and pyrolysis oil. 

 

    

 

 

      

 

B) Non-Condensing Circuit: Running the BEK in clean mode will take all of the pyrolysis gases from the reactor and burn them in the burner so as not to collect or release any liquids or emissions from the biocharring process. 

       

 

B) Non-Condensing Circuit: Running the BEK in clean mode will take all of the pyrolysis gases from the reactor and burn them in the burner so as not to collect or release any liquids or emissions from the biocharring process. 

 

 

7. Raw Biomass Auger and Level Switch

a) Auger Bucket

 

  

 

b) Biomass Auger

 

c) Level Switch

 

   

 

 

    

 

8. Hopper

 

  

 

 

9. Biochar Auger and Reservoir

A. Biochar Auger

 

         

 

 

 

 

B. Biochar Reservoir

 

        

   

 

9. Instrumentation  

A. Manometer  

 

     

 

B. Thermocouples

 

    


Return to BEK Main Page